28 - 30 June, 2017 | Crowne Plaza Auckland, Auckland, New Zealand

Steven Drury


Senior Structural Engineer
AECOM


4:20 PM Transmission Gully

The Transmission Gully project involves constructing a 27-km four-lane (two in each direction) motorway from MacKays to Linden. There will be interchanges at MacKays Crossing, SH58, eastern Porirua (James Cook), and at Kenepuru.
The project is part of the Wellington Northern Corridor and is a vital cog in the region’s transport system. It is designed to provide a critical and resilient lifeline to Wellington in the event of an earthquake or other major disruption. Importantly, it is a catalyst for local economic development.


Check out the incredible speaker line-up to see who will be joining Steven.

Download The Latest Agenda