Cutting Cost And Generating Efficiency Through Correct Pile Design And Seismic Dilometer
Cutting Cost and Generating Efficiency Through Correct Pile Design and Seismic Dilometer
In this presentation from Piling New Zealand 2016 Sergei Terzaghi, Principal at Arup explores:
Reflections on Modern Geotechnical Investigation: use of the Seismic Dilatometer for design
Obtaining reliable design values to ensure programme deadlines are met
Selecting the correct design of ground improvement
Modelling piles and pile groups
Cutting cost & generating efficiency: Looking at pile behavior in finite element program to identify different behaviours
Changing the mindset: Reconciling different perceptions and accepting results
Please note: That all fields marked with an asterisk (*) are required.
*Processing your payment may take a moment. Please click submit payment only once, and do not refresh this page. Doing so may result in your credit card being charged more than once.